 |
INSPECTION FOR MATERIAL QUALITY
|
 |
 |
Each piece is examined on all sides for defects prohibited by the purchaser's specifications. Each accepted piece is AWW hammer branded in one end. A report detailing the inspection is issued to the purchaser.
|
 |
 |
|
 |
|
 |
INSPECTION AFTER TREATMENT
|
 |
 |
Each treated charge is examined for damage, preservative retained and depth of preservative penetration. Each accepted piece is AWW hammer branded in one end (opposite material quality mark). A report detailing the inspection is issued to the purchaser.
|
 |
 |
|
 |
|
 |
INSPECTION DURING TREATMENT
|
 |
 |
The treating process is observed to assure conformance with the specification requirements. A sample of the preservative used in treatment is analyzed by the inspector in the laboratory at the treating plant.
|
 |
 |
|
 |
|